Harness engineering controls how software is built, and it already works well. But where the standard for what is right is weak, it stops there. NAHAR adds a layer on top.
02 Origin of the name
Hebrew
נָהָר
Nahar means river.
nahar · river
Three-letter root
נהר
nun · he · resh
to flow
To run as a river. To stream toward one place.
וְנָהֲרוּ אֵלָיו כָּל־הַגּוֹיִם
and all nations shall flow to itIsaiah 2:2
to shine
The same three letters also mean to be radiant. In Aramaic, nehora is light.
אָז תִּרְאִי וְנָהַרְתְּ
then you shall see and be radiantIsaiah 60:5
Let it flow, and let it be seen. Development flows from one source, and who changed what, and on what grounds, remains transparent.
A river flowed out of Eden to water the garden, and from there it divided and became four headwaters
Genesis 2:10
Reading the verse as structure
יֹצֵא מֵעֵדֶןOne sourceA river flows out of one place. The ontology is that source. The purpose, definitions and direction are there
לְהַשְׁקוֹת אֶת־הַגָּןWaters the gardenA river does not flow for its own sake. The roadmap and development grow on its water
לְאַרְבָּעָה רָאשִׁיםFour branchesFrom there it divides into four branches. Each module has its own role and does not cross into another's
·BanksA river has banks. The banks do not confine the water. They let it flow. The principles, the ceilings and the safeguards are the banks
·Back to the sourceWater that has flowed away becomes rain and returns to the source. Outcomes become input and improve the ontology
The name describes the structure. It is not evidence that the structure is right. The evidence is set out separately in the whitepaper.
03 Structure
One source. Four modules.
NAHAR is not a frame that holds development in place but a river that lets it flow. The roadmap and development begin from one source, the ontology, and the areas where people judge and supervise are separated from the areas that run automatically. A settled ontology does not waver, the path for changing it is always open, and there is only one such path.
AIDM-CORE
Ontology module
The only path through which the project ontology is maintained and changed. It analyzes the impact of a change request, reviews its consistency, obtains a human decision where one is needed, and applies the change. It issues pins to plan items and delivery cycles, and checks invariance.
Ontology
Write
Roadmap
No access
Human role
Human decides
AIDM-PATH
Roadmap module
The only path through which the development roadmap is built and changed. It builds plan items from their bases and ties them to concepts in the ontology, replans when the version changes, assigns items to delivery cycles, and closes them with a completion report.
Ontology
Read-only
Roadmap
Write
Human role
Automated, human supervises
AIDM-LIFT
Enhancement module
The only channel for input raised by people: new development, requests, ideas, improvements and policy changes. It assesses the input against the project ontology, evaluates its impact, and produces a confirmed plan after two reviews. It is the only entry point for proposing changes to the ontology and the roadmap.
Ontology
Propose
Roadmap
Propose
Human role
Human decides
AIDM-SET
Delivery module
Takes the plan items assigned by the Roadmap module and runs, records and evaluates one full cycle, from consistency review to completion report. The ontology and the roadmap are read-only.
Ontology
Read-only
Roadmap
Read-only
Human role
Automated, human supervises
There is exactly one path for changing the ontology and one for changing the roadmap. If any other module contains such an action, the automated check fails.
04 Safeguards
Riverbanks do not confine a river. They let it flow.
A single write pathOnly the Ontology module writes the ontology, and only the Roadmap module writes the roadmap. No other module has an action that writes them.
No change without a basisChange requests for the ontology come only from a confirmed plan, and changes to the roadmap are accepted only with a declared basis.
Analysis before decisionDecision-makers are never given the options alone. The decision screen opens only when an impact analysis and a consistency review are attached.
Separation of authoring and reviewThe run that writes a draft and the run that reviews it are separate, and review only raises objections.
PinA plan item carries the fingerprints of the ontology items it relied on when it was planned. They are compared with the current version before assignment and before start.
Stop ruleWhen development meets a problem that can be resolved only by changing a declaration, it does not decide for itself. The delivery cycle stops, the item is returned, and the matter is raised as input for review.
Invariance checkBefore a delivery cycle is closed, the meaning of the ontology is compared with what it was at start. If it differs, the cycle is not closed.
Replanning on version changeThe open items and in-progress delivery cycles affected by a new version of the ontology are notified, and only the affected items are replanned.
05 Comparison
NAHAR does not replace the harness. It builds on it.
Compared on the same criteria
Harness engineeringNAHAR
What is the source of truth
The documents and specs in the repository. A principles document is set once and applied.
→
A single source, the project ontology. It is versioned and fingerprinted, and the roadmap is derived from it.
Who writes the source of truth
Not defined. The same agent edits the spec and implements it.
→
Only the Ontology module writes the ontology, and only the Roadmap module writes the roadmap. If another module contains that action, the check blocks it.
When execution changes intent
A human notices during review.
→
A pin comparison before start and an invariance check before close. If a change is needed, work stops and the matter is escalated.
The human role
Steering, through approvals and permission modes.
→
Decision and supervision are separated. People decide direction and supervise execution.
Basis for decisions
Specs and conversation.
→
The decision screen opens only when an impact analysis and a consistency review are attached.
How autonomy is raised
Components are removed as the model improves. Users delegate more as they gain familiarity.
→
Each judgment point has a level, raised one step at a time on evidence and approval. If the error budget is exceeded, it is lowered automatically.
What it learns from
Retrospectives on failures, and revised instructions.
→
The label recorded for each judgment and the outcome confirmed afterward.
06 AUTO PILOT
Blueprint
The loop never stops. People and the wisdom agent step in when needed.
The structure in which the modules, people and the wisdom agent interlock and cycle on their own. It is a blueprint of the finished form
9beats12human entry points
Modules and executors
Wisdom agent
Human
This is a design. Today the project lead holds the human seat and the wisdom agent has not been built. The structure is complete only once evidence has accumulated and levels have risen at each judgment point.
07 Wisdom
Knowledge is knowing the answer.Wisdom is knowing when not to trust your own answer.
W-1
Calibration
Does its self-assessed confidence match its actual accuracy
How it is measuredAccuracy per confidence band, compared with the value the project lead chose first, blind
W-2
Asking and stopping
Does it stop when it should stop, and go on when it need not
How it is measuredOf the cases where it stopped, the share in which the human actually changed direction, and the share in which it did not stop but the human overturned it
W-3
Predicting impact
Does the scope of impact it predicted match the scope that actually changed
How it is measuredThe difference between the impact grade it assigned and the outcome that followed
W-4
Novel situations
Do the three above hold for kinds of decision it has not seen before
How it is measuredSelect only decisions with no precedent and measure the same metrics again
W-5
Changing perspective
Does it make the case for the other side on its own before deciding
How it is measuredOf the objections raised by independent review, the share the agent had already written down first
L3Ontology governance: enforcement and measurement
L4Earned autonomy
L5Agent with wisdom
4Modules
21Principles
91Rules
35Stages in one cycle
20%Stages led by people
0Automated check failures
Figures are calculated from source data when this page is loaded.
The road ahead
2.x
Enforcement
Actually block what is declared. Fingerprints and pins, the invariance check, the change request ledger, write isolation for execution
Exit criteriaDeclarations changed without a change request: 0. Delivery cycles closed without an invariance check: 0
3.0
Measurement and shadow mode
Accumulate a label for each judgment and an outcome label for each outcome, and run the judgment module in shadow mode. Measure the five tests of wisdom
Exit criteriaFor each judgment point, shadow judgments and outcomes have reached the set number, and there are values for the tests of wisdom
4.0
Earned autonomy
Raise the level at each judgment point by evidence and approval. The ways of learning come in this order: rules, scoring formulas, AI judgment, statistical models, learned models. A learned model is used only when that point has enough data
Exit criteriaA low-impact judgment point has kept its error budget at the delegated level for two consecutive quarters
5.0
Agent with wisdom
An agent takes the human seat. First together with the project lead, then alone, starting with low-impact cases. The modules and gates stay as they are. The finished form is drawn in NAHAR's AUTO PILOT: a loop that does not stop, and doors in
Exit criteriaThe reversal rate of direction decisions made by the agent in the human seat is at or below the project lead's baseline
Every figure on this site and in the whitepaper is calculated from source data when the page is loaded. When the source changes, the figures change with it.
What is unproven is stated as such
Every claim cites its basis. Claims that are conditional or not yet proven are marked accordingly.
Design and implementation are reported separately
What is planned and what is built are never mixed. A higher version number does not mean a higher level.
09 Availability
NAHAR will be openly available.
The modules we use in our own development will be released as they are, free of charge. An Enterprise edition for organization-wide adoption, and AUTO PILOT implementation and consulting, will be offered separately.
Free · Open
Open modules
The modules and their packages, the principles and rules, and the automated checks are released as they are. Anyone can apply them to their own project ontology.
Paid
Enterprise
An edition for organizations in which multiple teams and projects share one source of truth. Details will be announced once finalized.
Implementation · Consulting
AUTO PILOT
We help organizations establish their ontology and raise autonomy at each judgment point as evidence accumulates.
The release schedule and details are in preparation and will be announced on this page once finalized.
Contact us about adoption and collaboration.
We welcome inquiries about applying the open modules, adopting the Enterprise edition, and AUTO PILOT implementation and consulting.
The figures in this document are not entered by hand. They are calculated from source data when the page is loaded. Every claim cites an ontology ID or an external source.